Design Procedure

A graphical approach to drillstring design is recommended. If one section of the string does not meet requirements it must be upgraded. The procedure is as follows:

1. Choose a weight and grade of pipe to satisfy the collapse conditions

2. Using the pipe chosen in 1. calculate the tension loading, including buoyancy effects. Draw the tension loading line and also the maximum allowable load line.

3. Modify the tension load as given in 2. by applying a design factor, MOP and Sh/St factor. Three design lines are thus generated.

4. If any of these design lines exceed the maximum allowable load, a higher rated drillpipe must be used for that section of pipe.

5. Calculate the new tension loading line for the new drill string and repeat steps 3. and 4.

Design Example :

Design a 5” 19.5 lb/ft drill string using new pipe to reach a TD of 12000 ft in a vertical hole. The BHA consists of 20 drill collars 6 1/4” x 2 13/14” (82.6 lb/ft) each 30 ft long. For design purposes assume the following:

MW = 10 ppg

MOP = 100000 lbs

Length of slips = 12”

Design factors = 1.125 (collapse)

= 85% (tension)

1. Collapse loading at 12000’ Pc = 0.052 x 10 x 12000 = 6240 psi

From Table 11

OD

Grade

Wt

Collapse rating

5”

E

19.5 lb/ft

10000 = 8889 psi (x 1.125)

5”

E

25.6 lb/ft

13500 =12000 psi (x 1.125)

choose: 19.5 lb/ft grade E drill pipe (ID = 4.276”)

2. Tension loading line (Figure 17)

at 12000’ Fj = (P x A)

where: P = 0.052 x 10 x 12000 = 6240 psi

A = п/4 (6.252 — 2.8122) = 24.47in2

Fj = (6240 x 24.47) = 152693 lbs

W11 = 20 x 30 x 82.6 = 49560 lbs

at 11400’ F2 = (P x A)

where: P = 0.052 x 10 x 11400 = 5928 psi

A = п/4 (6.252-52) + п/4 (4.2762-2.81252) = 19.19 in2

F2 = (5928 x 19.19) = 113758 lbs.

W2 = 11400 x 19.5 = 222300 lbs (Nominal weight used as approximation)

Calculating the tension at the top and bottom of each section:

at bottom of collars T = -152693 lbs

at top of collars T = -152693 + 49560 = -103133 lbs

at bottom of drill pipe T = -103133 + 113758 = 10625 lbs

at top of drillpipe T = 10625 + 222300 = 232925 lbs

Plot these figures on a graph, along with the maximum allowable load = 0.85×395000 = 335750 lbs

3. Construct Design loading lines:

a. multiply actual loads by 1.3 to obtain the design loads (Td) at surface T = 1.3 x 232925 = 302802 lbs

d

at 11400’ T = 1.3 x 10625 = 13812 lbs

d

b. add 100000 MOP to obtain Td

at surface Td = 232925 + 100000 = 332925 lbs at 11400’ Td = 10625 + 100000 = 110625 lbs

c. apply slip crushing factor

at surface T = 1.59 x 232925 = 370351 lbs

d

at 11400’ T = 1.59 x 10625 = 16894 lbs

d

Plot these 3 design lines on Figure 17

4. Above 2000’ the design loading line exceeds the maximum allowable tensile load, therefore a stronger section of pipe must be used from 0 — 2000’.

Choose 25.6 lb/ft grade E drill pipe.

5. Re-calculate tensile loading for new string and repeat 3. and 4. (Figure 18).

Design Procedure

-150000 -50000 50000 150000 250000 350000 TENSION (LBS)

‘■ TENSION LOAD

O — TENSION LOAD X 1.3 (D. F.)

!• TENSION LOAD + 100000 LBS (MOP)

D — TENSION LOAD X 1.59 (Sh/St) — MAX. ALLOW. LOAD

Figure 17 Calculated Tension Loading on Drillpipe

Design Procedure

Figure 18 Revised Tension Loading on Drillpipe