Карта сайта
Публикации
- Категория: Drilling engineering (continued)
- Natural Diamond Bits
- Roller Cone Bits
- TYPES OF DRILLING BIT
- MUD DENSITY, GRADIENT AND BUOYANCY FACTOR
- Final design
- Design Procedure
- Drill Pipe Selection
- Length of Drillcollars
- Bending Moments in String Design
- DRILL STRING DESIGN
- OTHER DRILLSTRING COMPONENTS
- Special Types of Collar
- DRILL COLLARS
- HEAVY WALL DRILLPIPE (HWDP)
- TOOL JOINTS
- Drillpipe Inspection
- Drillpipe Stress and Failure
- DRILL PIPE
- LEARNING OBJECTIVES
- Exercise 1 The Hoisting System
- Well monitoring system
- Well control system
- Top Drive Systems
- Procedure for Pulling the Drillstring from the Hole
- Procedure for Adding Drillpipe when Drilling Ahead
- ROTARY SYSTEM
- Circulating System
- HOISTING SYSTEM
- POWER SYSTEM
- Well Monitoring Equipment
- Drilling Cost Estimates
- DRILLING ECONOMICS
- OFFSHORE DRILLING
- Completing the Well
- Drilling and Casing the 12 1/4” Hole
- Drilling and Casing the 26” Hole
- THE DRILLING PROCESS
- ROTARY DRILLING EQUIPMENT
- THE DRILLING PROPOSAL AND DRILLING PROGRAM
- DRILLING PERSONNEL
- Exploration, Development and Abandonment
- C O N T E N T S
- DEFINITIONS AND GLOSSARY OF TERMS
- Категория: Gasification